How and when should I water my concrete decking?

After your concrete decking is applied, it’s important to wait 24 hours before starting the watering process. This allows the surface to begin its initial curing. Check with your project manager to confirm the need to water as certain surfaces will not require this.

To ensure proper curing, water the concrete at least twice daily or up to three times a day during warmer months. Overwatering is not a concern, so continue watering consistently for up to 30 days. However, a minimum of two weeks of regular watering is highly recommended to achieve optimal curing results.

Proper watering is essential to prevent cracking and ensure your concrete decking reaches its full strength and durability.