After your concrete decking is applied, it’s important to wait 24 hours before starting the watering process. This allows the surface to begin its initial curing. Check with your project manager to confirm the need to water as certain surfaces will not require this.
To ensure proper curing, water the concrete at least twice daily or up to three times a day during warmer months. Overwatering is not a concern, so continue watering consistently for up to 30 days. However, a minimum of two weeks of regular watering is highly recommended to achieve optimal curing results.
Proper watering is essential to prevent cracking and ensure your concrete decking reaches its full strength and durability.
Yes, decking modifications can be made before the concrete is poured. Prior to pouring, a deck spray-out will be done, which provides a layout of the deck area. At this stage, you can discuss any desired changes or adjustments with your Project Manager.
It’s best to make decisions on decking modifications during this phase to ensure your pool design aligns with your vision. If there will be changes to gutters on your home this would be a good time to discuss the layout to ensure proper drainage with your new decking.